Complete removal of old control system, operator interface
Installation of new controllers, gauges, operator interface
Implementation of recipe database, alarm system, process monitoring
Operator manual with electrical schematics
Investigation of current machinery hardware and electrical interface
Tailored removal of electrical control system and process controllers
Removal of obsolete equipment/component
Installation of equipment
Integration to existing control system
Testing to ensure production ready
Installation of process control equipment
Programming of data logging
Transfer of batch logs to archive
OEM-trained machine management
Electrical, mechanical system isolation
Preparation for crating/shipping
Machine installation
Facility preparation
Power distribution to equipment
Troubleshooting of existing control system, equipment, etc.